Header
Updated: 11-Apr-2000 AC/310

 
CNAD

SG 3

 
 

AC/310, SUB-GROUP 2 ON FUZING AND OTHER INITIATION SYSTEMS OF MUNITIONS

 

AC/310, Sub-Group 2 develops design principles, test techniques, and safety criteria for all air, sea and land service fuzing and other munition initiation systems.

The full Terms of Reference are at Annex E-3 of the Handbook on the Aim, Organization and Working Practices of the Group

Promulgated documents produced by the Group: (Standardization Agreements (STANAGs) state NATO policy related to the Terms of Reference of the Group, and Allied Ordnance Publications (AOPs) amplify and provide guidance on that policy.)

STANAG

Number

Title
Dated
2916 Ed 1
Nose Fuze Contours and Matching Projectile Cavities for Artillery and Mortar Projectiles Nov. 1989
4157 Ed 1
Development of Safety Test Methods and Procedures for Fuzes for Unguided Tube Launched Projectiles Aug. 1991

4187 Ed 1

with

AOP16 Ed 3

Fuzing Systems - Safety Design Requirements Fuzing Systems

Design Guidelines for STANAG 4187

Oct. 1996

 

Oct. 1999

4326 Ed 1

with

AOP8 Ed 1

NATO Fuze Characteristics Data - AOP

8NATO Fuze Characteristics Catalogue

Oct. 1990

 

Jan. 2000

4363 Ed 1


with

AOP21 Ed1

Fuzing Systems:Development Testing for the Assessment of Leads and Booster Explosive Components

Fuzing Systems:Manual of Development Characterisation and Safety test Methods and Procedures for Lead and Booster Explosive Components

Oct. 1997

 

 

May 1998

4368 Ed 1
Electric and Laser Ignition System for Rockets and Guided Missile Motors: Safety Design requirements Feb. 1998

 

4369 Ed 1

with

AOP22 Ed1

 

Design Requirements for Inductive Setting of Large Caliber Projectile Fuzes

Design Criteria and Test Methods for Inductive Setting of Electronic projectile Fuzes

Oct. 1996

 

Mar. 1993